Industrial construction

From the ground up to equipment running under load.

We help forestry, pulp and paper, mining and biomass facilities fabricate, erect, install and commission under one contract — and we stay through startup until you sign off. Since 1994. Licensed in Canada and USA.

Start the conversation

We respond within one business day.





    No obligation. If it is not a fit, we will say so.

    Certified & qualified

    • BCCSABCCSACertified
    • Red SealRed SealCertified trades
    • CWB WeldingCWB WeldingCertified
    • CORCORNational standard
    • USLicensedin 
Canada and USA

    Case study

    See one project from start to finish

    A large-scale construction project at a Weyerhaeuser facility, from bid through commissioning — told by the crews who ran it and the client who lives with the result.

    Discuss your project

    Track record

    Omineca in numbers

    Three decades of industrial construction across demanding operating environments.

    Building since
    1994
    Building since
    Construction projects delivered
    99100+
    Construction projects delivered
    Tons of steel erected
    9991000+
    Tons of steel erected
    Shortest outage
    24hours
    Shortest outage we have worked inside
    Longest site
    8months
    Longest continuous site

    Have a project coming up?

    Discuss Your Project

    Completed projects

    Projects we’ve delivered

    Equipment installations, facility upgrades and turnkey builds across British Columbia and the United States.

    • Kanaka Creek Pole Mill Expansion
      TurnkeyMaple Ridge, BC

      Kanaka Creek Pole Mill Expansion

    • Chip Plant Debarker Line Expansion
      Equipment installationPrince George, BC

      Chip Plant Debarker Line Expansion

    • Coal Transfer Tower
      Facility upgradeTumbler Ridge, BC

      Coal Transfer Tower

    • Biomass Dryer Installation
      Equipment installationPrince George, BC

      Biomass Dryer Installation

    • Debarker Removal and Replacement
      Equipment installationHouston, BC

      Debarker Removal and Replacement

    The problem

    Most industrial construction problems are handover problems

    The work usually gets done. What goes wrong is what happens between the contractors doing it.

    • 01

      Nobody owns the gaps

      The fabricator says it was erected wrong. The erector says it was fabricated wrong. You are the one holding both contracts and the schedule.

    • 02

      The crew leaves before it runs

      Equipment is bolted down and the contractor demobilizes. Everything that surfaces on the first production run becomes your problem to solve.

    • 03

      Changes surface too late

      Scope changes get discovered at the end of the month instead of the day they happen, when they are still cheap to solve.

    How Omineca solves it

    One team owns the project from start to running

    Discuss Your Project

    Scope

    What we deliver

    Six deliverables under one contract — take the part you need, or all of it.

    1. 01

      Site preparation

      Clearing, excavating and grading.

    2. 02

      Concrete work

      Forming, pouring and finishing foundations and equipment pads.

    3. 03

      Structural steel erection

      Fabricated in our own shop, erected by our own crews.

    4. 04

      Equipment installation

      Setting mechanical equipment onto the steel we erected — debarkers, merch stalls, conveyance, screening plants.

    5. 05

      Demolition and retrofit

      Removing or adapting existing structures to accept new equipment, including inside operating facilities.

      Runs at any point in the sequence
    6. 06

      Commissioning

      Running the equipment, correcting what surfaces, and staying until you sign off.

    Need part of this, or all of it?

    Discuss Your Project

    Project scale

    No project is too big or too small

    • Sawmill equipment changed out during a night shutdown01

      Small scale

      A single piece of equipment changed out inside a shutdown window, running day and night shifts to hit it.

      A trimmer changed out in a four-day shutdown in North Carolina — mobilized from BC, one week on site.

    • Large mine retrofit site with conveyance structures02

      Large scale

      Multi-month projects with crew rotation and accommodation managed by us, so the work runs continuously.

      An eight-month mine retrofit: shaker screens installed, conveyance system rebuilt, and a silo relined in the field with 110,000 lbs of plate.

    • Completed turnkey peeler line installed inside a plant03

      Turnkey

      We manage and deliver the entire project — drawings, fabrication, installation and commissioning.

      A peeler line delivered end to end: our drawings, our fabrication, our installation, our commissioning.

    Red Seal certified welders working in the Omineca fabrication shop

    The same crew, whatever the scale

    Red Seal certified fabricators, welders, machinists and industrial mechanics — employed by us, not assembled per project.

    Our construction crews have hands-on maintenance experience, so they build with long-term operation and serviceability in mind.

    Tell us the scale you’re working at

    Discuss Your Project

    Commissioning

    We stay until it runs

    Equipment can be installed exactly to drawing and still need adjustment the first time real material runs through it.

    We run the material through ourselves. That is when you see where the bark is actually falling, which hydraulic line is weeping, and whether material hangs up at a transition.

    What commissioning covers

    • Running the equipment under real production conditions
    • Correcting hang-up points in material flow
    • Adding chuting so residuals reach the waste conveyor instead of the basement floor
    • Finding and fixing loose fittings and weeping hydraulic lines
    • Working with your maintenance team so they understand the equipment mechanically

    Mechanical training is included. Electrical and controls programming are handled by the equipment manufacturer.

    Crew discussing live commissioning readings beside operating industrial equipment

    “Bad commissioning used to be our bread and butter, because whenever somebody did bad commissioning, we came in behind them and fixed it all.”

    — Scott, Omineca Industrial

    Want a contractor who stays through startup?

    Discuss Your Project

    Process

    What happens after you get in touch

    1. 01

      We call you back

      Within one business day. We talk through the project before anyone commits to anything.

    2. 02

      We come to site

      If there is field work, we walk the area, review drawings and understand the constraints before pricing it.

    3. 03

      You get a scope and a number

      Documented, and detailed enough to take to your own budget approval.

    4. 04

      We mobilize

      Crew booking, rotation and accommodation arranged by us, so the work runs continuously.

    5. 05

      We stay through commissioning

      And the project closes when you sign off.

    Step one takes about ten minutes

    Discuss Your Project

    FAQ

    Questions we get asked

    Both. A single equipment changeout over a weekend is a normal scope for us, and so is an eight-month capital build. The changeout is often how a new client starts working with us.

    Question not answered here?

    Discuss Your Project

    Get in touch

    Tell us what you’re building

    Send us your details and we will call you back to talk through the scope. If it is not something we should be doing, we will tell you that instead of quoting it.

    Prefer to talk?

    +1 (250) 562-6769 Prefer to Talk — Call Us

    Equipment down outside working hours? Our on-call line is answered 24 hours.

    We respond within one business day.

    Send us the scope






      Helps us understand mobilization before we call you back.



      PDF, DWG, DXF or image, up to 25 MB.